The work breakdown structure (WBS) for building a house (levels 1 and 2) is shown below: a) Add… 1 answer below »

The work breakdown structure (WBS) for building a house (levels 1 and 2) is shown below:a) Add two level-3 activities to each of the level-2 activities to provide more detail to the WBS.b) Select one of your level-3 activities and add two level-4 activities below it.
 